Vapor Recovery Certification Phase II EVR Executive Orders
Executive Order VR-201-MThis page last reviewed August 31, 2011
Healy Phase II Enhanced Vapor Recovery SystemModification Highlights
Executive Order VR-201-M
Full VR-201-M Download [ PDF - 5.04MB]
Legal
|
Legal Document |
Exhibit
1 |
Equipment List |
Exhibit
2 |
System Specifications |
Exhibit
3 |
Manufacturing Performance Standards and Specifications |
Exhibit
4 |
Determination of Static Pressure Performance of the Healy Clean Air Separator |
Exhibit
5 |
Vapor to Liquid Volume Ratio |
Exhibit
6 |
Healy Warranty |
Exhibit
7 |
Nozzle Bag Test Procedure |
Exhibit
8 |
Required Items in Conducting TP-201.3 |
Exhibit
9 |
Liquid Condensate Trap Compliance Test |
Installation, Operation and Maintenance Manual (IOM)
Full IOM VR-201-M Download [PDF - 33.51MB]
IOM1
|
Table of Contents |
IOM2
|
Healy Systems Scheduled Maintenance |
IOM3
|
Healy 900 Series Nozzle |
IOM4
|
Installation Instructions for Clean Air Separator |
IOM5
|
Healy Model 75 Series Inverted Coaxial Hoses |
IOM6
|
Healy Model CX6 Series Hose Adaptors |
IOM7
|
Healy Model 8701VV Breakaway |
IOM8
|
Healy Model 807 Swivel Breakaway |
IOM9
|
Healy 1301 Flow Limiter |
IOM10
|
Healy 1302 Flow Limiter |
IOM11
|
Gilbarco Encore Dispenser |
IOM12
|
Gilbarco GasBoy Dispenser |
IOM13
|
Wayne Harmony Balance Dispenser |
IOM14
|
Wayne Harmony WayneVac Dispenser |
IOM15
|
Wayne Ovation Dispenser |
IOM16
|
Wayne Vista Balance Dispenser |
IOM17
|
Wayne Global Century, Reliance and Select Dispenser |
IOM18
|
Healy Universal Manual |
IOM19
|
Liquid Condensate Trap |
New EasyGrip Reconnection Clamp
July 14, 2011 Letter to GA Ninety to use the EasyGrip reconnection clamp to reconnect the Healy 8701VV Breakaway
Modified Healy 795 Reconnection Clamp
June 22, 2011 Letter to Franklin Fueling Systems to implement design change to the Healy 795 Reconnection Clamp
ARB Letter
Franklin Fueling Systems Request for Spout Modification, New Spout Epoxy and Epoxy Curing Procedure.
900 EVR Nozzle and VP-1000 Design Modifications
January 23,2009 Letter to Franklin Fueling Systems to implement design changes to model 900 EVR nozzle and VP-1000 vacuum pump.
ARB Letter
Franklin Fueling Systems Request to Use New Vendor for Their Model 900 EVR Nozzle Casting
VP-1000 Design Improvements
September 18, 2007 Letter to Franklin Fueling Systems to implement VP-1000 design improvements.
Clean Air Separator Paint Colors
August 2, 2007 letter clarifying that the Healy Clean Air Separator may be painted any color.
Correspondence related to VR-201
April 29, 2005 letter to WSPA clarifying that the Healy Clean Air Separator is not an Aboveground Storage Tank under CA State Law.
The superseded version of the above document can be found by clicking on the link below :
-
Superseded Executive Order VR-201-L
-
Superseded Executive Order VR-201-K
-
Superseded Executive Order VR-201-J
-
Superseded Executive Order VR-201-I
-
Superseded Executive Order VR-201-H
-
Superseded Executive Order VR-201-G
-
Superseded Executive Order VR-201-F
-
Superseded Executive Order VR-201-E
-
Superseded Executive Order VR-201-D
-
Superseded Executive Order VR-201-C
-
Superseded Executive Order VR-201-B
- Superseded Executive Order VR-201-A


