|
|
|
|
Executive Order VR-202-A This page updated May 3, 2006 |
|
For Netscape users - hold SHIFT key and click the link for download For Explorer users - right click the link and select "Save Target As..." for download or Simply click the link to allow the PDF Reader to open the document within the browser |
|
Healy Phase II Enhanced Vapor Recovery System Including Veeder-Root ISD System Executive Order VR-202-A Full VR-202-A Download [ PDF - 2325K ] |
| Legal Document - PDF [ 191K ] | |
| Equipment List - PDF [ 471K ] | |
| System Specifications - PDF [ 1210K ] | |
| Manufacturer Performance Standards and Specifications - PDF [ 22K ] | |
| Determination of Static Pressure Performance of the Healy Clean Air Separator - PDF [ 98K ] | |
| Vapor to Liquid Volume Ratio for Healy Phase II EVR System - PDF [ 117K ] | |
| Healy Warranty - PDF [ 84K ] | |
| Nozzle Bag Test Procedure - PDF [ 11K ] | |
| Required Items in Conducting TP-201.3 - PDF [ 20K ] | |
| ISD Operability Test - PDF [ 20K ] |
|
Installation, Operation and Maintenance Manual Full IOM Download [ PDF - 33MB ] |
| Table of Contents - PDF [ 33K ] | |
| Healy Systems Scheduled Maintenance - PDF [ 80K ] | |
| Healy 900 Series Nozzle - PDF [ 3,781K ] | |
| Installation Instructions for Clean Air Separator - PDF [ 395K ] | |
| Healy Model 75B Series Inverted Coaxial Hoses - PDF [ 127K ] | |
| Healy Model CX6 Series Hose Adaptors - PDF [ 15K ] | |
| Healy Model 8701VV Breakaway - PDF [ 133K ] | |
| Healy 1301 Flow Limiter - PDF [ 970K ] | |
| Husky Model 4885 2-Inch Threaded Pressure/Vacuum Vent Valve - PDF [ 34K ] | |
| Gilbarco Encore Dispenser - PDF [ 4,624K ] | |
| GasBoy Dispenser - PDF [ 5306K ] | |
| Wayne Harmony Balance Dispenser - PDF [ 3,056K ] | |
| Wayne Harmony WayneVac Dispenser - PDF [ 4,261K ] | |
| Ovation Dispenser - PDF [ 3,736K ] | |
| 3V Wayne Balance Dispenser - PDF [ 3,907K ] | |
| ISD Install, Setup, & Operation Manual - PDF [ 1,036K ] | |
| ISD Vapor Flow Meter Installation Guide - PDF [ 623K ] | |
| ISD Pressure Sensor Installation Guide - PDF [ 565K ] |
| Correspondence related to VR-202-A - April 29, 2005 letter to WSPA clarifying that the Healy Clean Air Separator is not an Aboveground Storage Tank under CA State Law PDF (159K) |
|
Top of page |