|
|
|
|
|
|
|
Executive Order VR-202-B This page updated January 8, 2007 |
|
|
| For Netscape users - hold SHIFT key and click the link for download For Explorer users - right click the link and select "Save Target As..." for download or Simply click the link to allow the PDF Reader to open the document within the browser |
|
|
| Healy Phase II Enhanced Vapor Recovery System Executive Order VR-202-B Full VR-201-B Download [ PDF - 2,325K ] |
| Legal Document | |
| Equipment List | |
| System Specifications | |
| Manufacturing Performance Standards and Specifications | |
| Determination of Static Pressure Performance of the Healy Clean Air Separator | |
| Vapor to Liquid Volume Ratio | |
| Healy Warranty | |
| Nozzle Bag Test Procedure | |
| Required Items in Conducting TP-201.3 | |
| ISD Operability Test Procedure | |
| Veeder-Root In-Station Diagnostic Software Versions 1.00 and 1.01 |
|
Installation, Operation and Maintenance Manual Full IOM Download [ PDF - 27MB ] |
| Table of Contents - PDF [ 43K ] | |
| Healy Systems Scheduled Maintenance - PDF [ 83K ] | |
| Healy 900 Series Nozzle - PDF [ 762K ] | |
| Installation Instructions for Clean Air Separator - PDF [ 382K ] | |
| Healy Model 75B Series Inverted Coaxial Hoses - PDF [ 82K ] | |
| Healy Model CX6 Series Hose Adaptors - PDF [ 26K ] | |
| Healy Model 8701VV Breakaway - PDF [ 152K ] | |
| Healy Model 807 Swivel - PDF [ 206K ] | |
| Healy 1301 Flow Limiter - PDF [ 336K ] | |
| Healy 1302 Flow Limiter - PDF [ 172K ] | |
| Husky Model 4885 2-Inch Threaded Pressure/Vacuum Vent Valve - PDF [ 41K ] | |
| Gilbarco Encore Dispenser - PDF [ 4,520K ] | |
| GasBoy Dispenser - PDF [ 5180K ] | |
| Wayne Harmony Balance Dispenser - PDF [ 3,000K ] | |
| Wayne Harmony WayneVac Dispenser - PDF [ 4,161K ] | |
| Ovation Dispenser - PDF [ 3,650K ] | |
| 3V Wayne Balance Dispenser - PDF [ 3,810K ] | |
| ISD Install, Setup, & Operation Manual - PDF [ 919K ] | |
| ISD Vapor Flow Meter Installation Guide - PDF [ 622K ] | |
| ISD Pressure Sensor Installation Guide - PDF [ 564K ] |
| Correspondence related to VR-202-A April 29, 2005 letter to WSPA clarifying that the Healy Clean Air Separator is not an Aboveground Storage Tank under CA State Law PDF (159K) |
| The superseded version of the above document can be found by clicking on the link below : |
|
|