Background
The ARB evaluates and tests new or modified vapor recovery systems. These systems recover the gasoline vapors generated while fueling vehicles in a service station. The goal of the program is to assure that the vapor recovery systems which meet the stringent certification requirements are certified expeditiously.
What's New:
ARB Response to US EPA ORVR Widespread Use RuleExecutive Orders VR-203-M and VR-204-M
The VST Phase II EVR Executive Orders have been extended one year to provide more time to complete a 4-year renewal evaluation.
Executive Order G-70-213-C
Extension to the effective and operative dates for Phase II EVR and ISD for Gasoline Dispensing Facilities using ASTs.
Notice of Public Availability of Modified Text to the Vapor Recovery Equipment Defects (VRED) List.
This is a 15-day comment period.
Revised Advisory 405-B
Advisory 405-B has been revised since the initial release on October 10, 2011.
• Two additional certified EVR systems covered by Advisory 405-B have been added to Table 1.
• A footnote addressing Incon ISD “Ullage Pressure Leak Test” alarms has been added to Table 1.
Executive Orders VR-201-N and VR-202-N
Amendment to Healy Phase II EVR System with and without ISD
July 28, 2011 Vapor Recovery Workshop
- Workshop Notice
- Workshop Agenda
- Presentation
VR-402-A
Morrison Brothers Phase I Enhanced Vapor Recovery (EVR) System for Protected Aboveground Storage Tanks (AST)
Executive Order VR-301-C and VR-302-C
Standing Loss Control Vapor Recovery Systems for New and Existing Installations of Aboveground Storage Tanks
Notice of Proposed Amendments to the VRED List
Notice of Public Comment Period
Initial Statement of Reasons
EVR extension for gasoline dispensing facilities with bulk plants.
Executive Order G-70-215
Cover letter to stakeholders
Approval Letter # 10-05.
E.J. Ward, Inc. RF Nozzle Module, part# RF Hose Mod is approved for side mount
installations for nozzles listed in table 1. However, it is not approved to be mounted on
the left side of the Healy 900 or the 400 Phase II Vapor Recovery nozzles as it would
block the vapor adjustment screw and breather hole located underneath the scuff guard.